Energy Talks | Uzbekistan’s RE project pipeline and opportunities

Uzbekistan aims to deploy significant additional power capacity by 2030, including 5 GW of PV, 3 GW of wind energy, 3.8 GW of hydropower, as well as 2.4 GW of nuclear.

Large solar PV plants with capacities of 100-500 MW will be built mainly in the central and southern regions, with 50-200 MW solar plants in other parts of the country. Solar PV plants above 300 MW will gradually be equipped with energy storage systems. Large wind farms, with capacities of 100-500 MW, will be built mostly in the northwest region of Uzbekistan.

• How achievable is the goal of reaching 5 GW solar and 3 GW wind power capacities by 2030?
• ADB 1 GW Solar Program
• What are the main challenges of renewable energy deployment in Uzbekistan?
• What reform proposals are there for the sector regulation?

Participation is free of charge.

赞助方/参展方联络方式

Inessa
[javascript protected email address]

Publish your content with EB Premium

It's not about how many you reach. It's about who. Get your news, events, jobs and thought leadership seen by those who matter to you.

专题活动

Publish your event

特定岗位

Publish your job
leaf background pattern

改革创新,实现可持续性 加入Ecosystem →